1. background introduction
Wet electric mist eliminator is widely used in industrial fields as an efficient gaseous pollutant treatment equipment. The installation quality of its internal components is directly related to the operation effect and service life of the equipment. This article will detail the installation process of the internal components of the wet electric defogger.
2. Installation Preparation
1. Equipment inspection: check whether the wet electric defogger equipment is intact and whether the parts are complete.
2. Site preparation: Ensure that the installation site is clean and tidy and there is enough space for installation operations.
3. Tool preparation: prepare all kinds of tools required for installation, such as screwdrivers, wrenches, etc.
3. installation process
1. Foundation installation: According to the size and weight of the equipment, select the appropriate foundation to ensure that the equipment is installed horizontally.
2. Dust removal plate installation: gently place the dust removal plate to ensure that the distance between the plates is even to avoid collision.
3. Discharge electrode installation: accurately insert the discharge electrode into the predetermined position to ensure uniform spacing between the discharge electrode and the dust removal plate.
4. Nozzle and spray system installation: According to the equipment layout, install the nozzle and spray system to ensure uniform spray and no leakage.
5. Insulator installation: When installing insulators, it is necessary to ensure good contact with conductive parts and reliable insulation performance.
6. Wiring: Wiring according to the circuit diagram to ensure that the wiring is correct and the contact is good.
7. Sealing: seal the interfaces of the equipment to ensure no leakage.
4. considerations
1. Safety first: During the installation process, pay attention to personal safety and equipment safety to avoid accidents.
2. Accurate installation: to ensure that the components are installed in place, evenly spaced, so as not to affect the operation of the equipment.
3. Waterproof electrical conflict: During the wiring process, ensure that the electrical part is isolated from moisture to avoid electrical failure.
4. Tightness check: After the installation is completed, check the sealing parts of the equipment to ensure that there is no leakage.
5. Summary
The installation of the internal components of the wet electric defogger is a delicate process and requires strict operation in accordance with the installation process. After the installation is completed, a comprehensive inspection should be carried out to ensure the normal operation of the equipment. Correct installation can extend the service life of the equipment and improve the operating efficiency of the equipment.
Key words:
Environmental protection equipment
recommend Reading
Selection and precautions of bag filter?
2024-05-23
Daily maintenance of bag filter and boiler dust collector
2024-05-23
Use method of filter cartridge dust collector in industrial dust collector
2024-05-23